It’s the way that you do it
T'ain’t what you do. Some years ago while I was managing a control system project, one of the smaller tasks was dragging on and taking longer than planned. I asked the engineer how much time he expected it would take, and I was told “about 2 weeks”. A week later he revised his estimate to be “about 10 days”.